20 09

Last update at 20 · 09 · by milo

‧‧‧ One of 763

The U-Boot Typ VIIC was the workhorse of the German U-boat force, with 568 commissioned from 1940 to 1945.

U-Boot Typ VIIC schematic

The first VIIC boat commissioned was the U-93 in 1940. The Type VIIC was an effective fighting machine and was seen almost everywhere U-boats operated, although its range of only 8,500 nautical miles was not as great as that of the larger Type IX (11,000 nautical miles), severely limiting the time it could spend in the far reaches of the western and southern Atlantic without refueling from a tender or U-boat tanker.

Video
DETUSCHES U-BOOT TYP VII C

Video

The VIIC came into service toward the end of the “First Happy Time” near the beginning of the war and was still the most numerous type in service when Allied anti-submarine efforts finally defeated the U-boat campaign in late 1943 and 1944.





Designing often necessitates considering the aesthetic, functional, economic and sociopolitical dimensions of both the design object and design process.

Design

Home DesignU-Boot Typ VIIC
Related

Article

Architecture
milo

About

A brand & digital product designer,
developer and consultant.
Specialized in creating responsive web sites for Shopify.

milo 317

Contact milo

Say hello

Visit